Ningxia Hanas Pipeline Group Co., Ltd. was established in 2016, mainly engaged in natural gas pipeline construction, production and operation management and natural gas market development and sales business.  The company has a registered capital of 300 million yuan, in order to help energy transformation as its own responsibility. It undertakes the green dream, focuses on the development of natural gas clean energy industry, and uses global think tanks McKinsey and Boston to carry out strategic management and planning implementation. Careful layout of natural gas energy industry, continue to pay attention to people’s livelihood demands.

Since the founding of the company, the standard of management of advanced natural gas export and import enterprises both at home and abroad has been set as the operational guideline of “management specialization, market-oriented operation and maximum profit-making”, effectively strengthening infrastructure, actively carrying out management innovation, establishing and improving internal control system. And various supporting management system, and promote the rapid development of various businesses.

Especially in natural gas and pipeline construction, according to market demand, the Company co-ordinates the comprehensive balance of domestic and overseas and upstream and downstream areas, giving priority to the introduction of resources in strategic channels and strengthening the communication and convergence in all aspects of production, transportation, storage and transportation so as to ensure that urban residents, public utilities and key industries users safe and stable supply of gas.  We will steadily expand sales of natural gas, orderly use downstream businesses such as city gas and compressed natural gas, and realize the second value-added and profit maximization of the natural gas business.  Strengthen organizational and scientific construction to ensure that the construction of pipelines will be progressed in an orderly manner. And nodes will be put into operation safely and steadily.

In 2016, the Company plans to build the Hanas Hangjinqi to Yinchuan Natural Gas Pipeline Project. The project has been listed as one of the key projects under the 13th Five-Year Plan of Natural Gas Development and the 13th Five-Year Development Plan of Ningxia Hui Autonomous Region. By utilizing Sinopec in Mongolia, the natural gas resources of Hangjinqi gas field will be transported to Yinchuan, Ningxia through the centralized processing station of Hangjinqi Sinopec, which will become the second source of natural gas for people’s livelihood in Ningxia and benefit the people for the benefit of people’s livelihood.

The pipeline via Mongolia Hangjinqi, Etuokeqi, SanBeiangchang, Dusitu River to the Ningxia Pingluo Taole Town, from east to west across the Yellow River after Xingqing District of Helan Town, Yinchuan city into the control center through the gas pipeline network, the line length of approximately 282 kilometers. Among them, Ningxia section is about 91 kilometers, Mongolia section is about 191 kilometers, pipeline design pressure is 6.3 MPa. It uses 711 mm longitudinal and spiral submerged arc welded steel pipe and designed annual gas transmission capacity of 3.6 million cubic meters.

The line crosses the Yellow River once, the provincial river 1 times, passes through the middle and small rivers, the ditch more than 50 times. Through the 2 railway, highway 3, various provincial road near 200 times. Through the the Yellow River project as the key control project, through the length of about 2700 meters, depth of about 36 meters, using directional drilling crossing technology.

The project makes full use of digital intelligent platform and station control system for data acquisition and transmission control to realize the management of pipeline life cycle. The establishment of pipeline digital business cards marks the entire site and achieves traceability data tracking to ensure the safe, reliable and smooth operation of the pipeline.  The use of digital pipeline platform, all the details of the project, as small as a component, are without any omission, can improve efficiency, precision control construction progress.

The project was officially started on February 22, 2017 and is expected to be commissioned by the end of 2017.  Since the construction of the project, the work has progressed rapidly and the construction of the project has progressed in an orderly way.

With knowledge-based, professional and young oriented human resources, the company owns a large number of professionals engaged in project management and natural gas operations. The company now employs nearly 100 people, of whom 72 have bachelor degree or above, accounting for 75% of the total number of the company.  The company has medium and senior technical titles 16 people, one or two construction division 10 people.

We always adhering to the “safety first, quality first, efficiency first” philosophy. It is the responsibility of society and shareholders to create value, which is driven by broad market opportunities and mature and advanced management system. By actively participating in the market competition, we should try to cultivate the core competitiveness of the company, and through the implementation of strategic development, adhere to the innovation driven, pay attention to quality and efficiency, accelerate the transformation of development mode. To achieve the main indicators in 2020 to reach the advanced level of the country, and comprehensively enhance the competitiveness and profitability. Become the leading company of green development and sustainable development.

November 4, Hanas Group and Sinopec North China Oil and Gas Company and Ordos in Inner Mongolia held...